Hi all.
I'd like to kown if it's possible to put forward the date of a current campaign without loosing the reco informations about the units on the map.
And if possible, how ?
Thx for the answer !
Put forward Date
Moderator: SEOW Developers
-
22GCT_Gross
- Posts: 302
- Joined: Fri 13 Apr 2007 1:13 pm
- Location: Italy